Time Entry in PI can be controlled on the global level on the Time Entry Settings page, but what about controlling Time Entry on a specific Task or Project? Also totally doable!
- To enable Time Tracking for Tasks - see the link!
Task Level
To stop Time Entry on a task, go to edit mode under "Edit Task" and then to the Time & Expense tab. Make sure the checkbox is unchecked. Save!
Project Level
To stop Time Entry on an entire project, go to edit mode under "Edit Options" and make sure you are looking at the Options tab.
- Scoll down to "Default Task Options"
- Uncheck the checkbox that says "Enables the task to capture time" and make sure that's applied to "All tasks"
- Save!
Comments
0 comments
Please sign in to leave a comment.