Selector Box Field Name |
Column Displayed As |
Explanation |
Unit |
Actual Expense |
Actual Expense |
Total expenses entered as Expense Entries for all tasks in the project(s) + all Expense Entries entered at the project level (not on tasks). |
Currency |
Actual Hours |
Actual Hours |
Actual hours entered as Time Entries for all tasks in the project(s) + all Time Entries entered at the project level (not on tasks). |
Hours |
Actual Rate |
Actual Rate |
Actual Time / Actual Hours |
Currency |
Actual Time |
Actual Time |
Each time entry multiplied by its burden rate and subsequently summed for all time entries. |
Currency |
Actual Total |
Actual Total |
Actual Time + Actual Expenses Total |
Currency |
Approval Requests |
Approval Requests |
Hyperlinks to Approval Request with the name and approval status of the request. |
Hyperlink Text |
At Risk |
At Risk |
"At Risk" is manually assigned by a project manager. |
Checkbox |
Baseline Duration |
Baseline Duration |
The number of working days, hours and minutes in the saved baseline. |
Days |
Baseline End Date |
Baseline End Date |
The scheduled end date of the saved baseline. |
Date |
Baseline Start Date |
Baseline Start Date |
The scheduled start date of the saved baseline. |
Date |
Baseline Work Hours |
Baseline Work Hours |
The number of work hours assigned in the saved baseline. |
Hours |
Billable Expense |
Billable Expense |
Total expenses entered in Expense Entry as billable values. |
Currency |
Billable Hours |
Billable Hours |
Total hours entered in the Time Entry as billable hours. |
Hours |
Billable Rate |
Billable Rate |
Bill Rate for the resources' time entries. |
Currency |
Billable Time |
Billable Time |
Each time entry multiplied by its billable rate and subsequently summed for all time entries. |
Currency |
Billable Total |
Billable Total |
Billable Time + Billable Expense |
Currency |
Companies |
Companies |
Companies associated with the project by a project manager in the Project Add/Edit form. |
Text |
Company Contract Default |
Company Contract Default |
Company Contract assigned as the Contract Default for the project by the project manager in the Project Add/Edit form. It is displayed as "Company - Contract Number" |
Text |
Company Contract Default # |
Company Contract Default # |
Company Contract assigned as the Contract Default for the project by the project manager in the Project Add/Edit form. It is displayed as "Contract Number" |
Text |
Company Contracts |
Company Contracts |
Company Contracts (default and others) assigned to the project by the project manager in the Project Add/Edit form. It is displayed as "Company Name - Contract Number" |
Text |
Company Default |
Company Default |
Company assigned as the Company Default for the project by the project manager in the Project Add/Edit form. |
Text |
Current Critical Task |
Current Critical Task |
All critical tasks with a scheduled start date on or before the current date (today). |
Text |
Customer Job # |
Customer Job # |
Customer Job # entered as text by the project manager in the Project Add/Edit form. |
Text |
Customer Name |
Customer Name |
Customer Name entered as text by the project manager in the Project Add/Edit form. |
Text |
Description |
Description |
Project Description entered as text by the project manager in the Project Add/Edit form. |
Text |
Duration |
Duration |
Total working days, hours and minutes as calculated from the earliest scheduled start date and time to the latest scheduled end date and time in the project. |
Days, Hours and Minutes |
Est. Expense |
Est. Expense |
Total costs estimated in Estimated Fixed Cost for all tasks. |
Currency |
Est. Hours |
Est. Hours |
Total hours estimated in Estimated Hours for all tasks. |
Hours |
Est. Rate |
Est. Rate |
Rate estimated in Estimated Rate for task(s). |
Currency |
Est. Time |
Est. Time |
Estimated Rate x Estimated Hours |
Currency |
Est. Total |
Est. Total |
Estimated Time Total + Estimated Expense Total |
Currency |
Forward Progress |
Forward Progress |
Calculated work progress date based on percent complete and scheduled start date. |
Date |
Groups |
Groups |
Groups assigned to the project by the project manager in the Project Add/Edit form. |
Text |
Indicators |
Indicators |
Icon indicators to identify Health Parameters and Project Status. |
Icon |
Invoiced Expense |
Invoiced Expense |
Total Expense Entries included on current invoices. |
Currency |
Invoiced Hours |
Invoiced Hours |
Total Time Entries included on current invoices. |
Hours |
Invoiced Rate |
Invoiced Rate |
Calculated rate on current invoices for all currently Invoiced Hours. Calculated as "Invoiced Time / Invoiced Rate" |
Currency |
Invoiced Time |
Invoiced Time |
Total currency value of all Invoiced Hours |
Currency |
Invoiced Total |
Invoiced Total |
Invoiced Expense + Invoiced Time |
Currency |
Name |
Name |
Project Name as entered in the Project Add/Edit form. |
Text |
Number |
Number |
Project Number automatically assigned to the project when it is created. |
Text |
Percent Complete |
Percent Complete |
% Complete value as entered by the Task Owner. When calculated for more than one task: "Work Hours Completed/Work" for all included tasks. |
Percent |
Percent Complete (Duration) |
Percent Complete (Duration) |
Completed duration divided by Duration. |
Percent |
Profit - Actual |
Profit - Actual |
Target Billable Total - Actual Total. Profit you are targeting at the overall project level. |
Currency |
Profit - Actual % |
Profit - Actual % |
Profit - Target / Target Billable Total) |
Percent |
Profit - Actual (Invoice) |
Profit - Actual (Invoice) |
Invoiced Total - Actual Total |
Currency |
Profit - Actual (Invoice)% |
Profit - Actual (Invoice)% |
Profit - Actual (Invoice) / Invoiced Total |
Percent |
Profit - Estimated |
Profit - Estimated |
Profit - Estimated |
Currency |
Profit - Estimated % |
Profit - Estimated % |
Profit - Estimated / Proposed Total |
Percent |
Profit - Forecasted |
Profit - Forecasted |
Target Billable Total - Work Estimate At Completion |
Currency |
Profit - Forecasted % |
Profit - Forecasted % |
Profit - Forecasted / Target Billable Total |
Percent |
Profit - Forecasted CPI |
Profit - Forecasted CPI |
Target Billable Total - Work Estimate At Completion (CPI) |
Integer |
Profit - Planned |
Profit - Planned |
Target Billable Total - Work Total |
Currency |
Profit - Planned % |
Profit - Planned % |
Profit – Planned Total / Target Billable Total |
Percent |
Profit - Planned Time & Materials |
Profit - Planned Time & Materials |
Work Billable Planned Value - Actual Total |
Currency |
Profit - Planned Time & Materials % |
Profit - Planned Time & Materials % |
Profit - Planned Time & Materials / Work Billable Planned Value |
Percent |
Profit - Target |
Profit - Target |
Target Billable Total - Target Total |
Currency |
Profit - Target % |
Profit - Target % |
Profit - Target / Target Billable Total |
Percent |
Profit - Time & Materials |
Profit - Time & Materials |
Billable Total - Actual Total |
Currency |
Profit - Time & Materials % |
Profit - Time & Materials % |
Profit - Time & Materials / Billable Total |
Percent |
Profit - Forecasted Time & Materials |
Profit - Forecasted Time & Materials |
Work Billable Estimate at Completion - Work Estimate at Completion |
Currency |
Profit - Forecasted Time & Materials % |
Profit - Forecasted Time & Materials % |
Profit – Forecasted Time & Materials / Work Billable Estimate at Completion |
Percent |
Profit - Forecasted Time & Materials CPI |
Profit - Forecasted Time & Materials CPI |
Work Billable Estimate at Completion (CPI) - Work Estimate at Completion (CPI) |
Integer |
Profit - Forecasted Time & Materials CPI % |
Profit - Forecasted Time & Materials CPI % |
Profit – Forecasted Time & Materials CPI / Work Billable Estimate at Completion (CPI) |
Percent |
PO/Job # |
PO/Job # |
PO/Job # entered as text by the project manager in the Project Add/Edit form. |
Text |
Project Approval Request(s) |
Project Approval Request(s) |
The name of the approval (with a hyperlink to it)for any approval requested for the project. |
Text |
Project Managers |
Project Managers |
All resources assigned to the Project with the Resource Type as Project Manager. |
Text |
Prop. Expense |
Prop. Expense |
Sum of Proposed Expenses for all project(s) tasks. |
Currency |
Prop. Hours |
Prop. Hours |
Sum of all hours from Proposed Hours for all project(s) tasks. |
Hours |
Prop. Rate |
Prop. Rate |
Proposed Time Total / Proposed Hours |
Currency |
Prop. Time |
Prop. Time |
Sum of all Proposed Time Total from all project(s) tasks |
Currency |
Prop. Total |
Prop. Total |
Proposed Time Total + Proposed Expense Total |
Currency |
Recovery Billable Percent (CPI) |
Recovery Billable Percent (CPI) |
Target Budget Billable / Work Billable Estimate at Completion (CPI) |
Percent |
Recovery Percent (CPI) |
Recovery Percent (CPI) |
Target Work Total / Work Estimate at Completion |
Percent |
Recovery Billable Percent |
Recovery Billable Percent |
Target Budget Billable Total / Work Billable Estimate at Completion |
Percent |
Recovery Percent |
Recovery Percent |
Target Budget Total / Work Estimate at Completion |
Percent |
Resources |
Resources |
All resources assigned to the Project with the Resource Type as Project Resource or Project Scheduler. |
Text |
Scorecard Score |
Scorecard Score |
Current score from the most recent scorecard update on the project. |
Integer |
Sponsor(s) |
Sponsor(s) |
Project Sponsors selected for the project in the Project Add/Edit form. |
Text |
Start Date |
Start Date |
Schedule Start Date based on the start date of the earliest task schedule start date in the project. |
Date |
State |
State |
Project State assigned to the project in the Project Add/Edit form. |
Text |
Status |
Status |
Project Status assigned to the project in the Project Add/Edit form. |
Text |
Status Code |
Status Code |
Project Status Code as associated with the corresponding Project Status selection assigned to the project in the Project Add/Edit form. Project Status Codes are associated with Project Status in the Global Settings by Project Insight administrators. |
Text |
Status Comment (Last) Author |
Status Comment (Last) Author |
The last (most recent) Project Status Comment Author posting the last (most recent) Project Status Comment. If status comment filtering is applied in the report, this will be the last comment matching the status comment filtering options in the report. |
Text |
Status Comment (Last) Comment |
Status Comment (Last) Comment |
The last (most recent) Project Status Comment assigned to the project in the Project Status View. If status comment filtering is applied in the report, this will be the last comment matching the status comment filtering options in the report. |
Text |
Status Comment (Last) Type |
Status Comment (Last) Type |
The last (most recent) Project Status Comment Type assigned to the project in the Project Status View. If status comment filtering is applied in the report, this will be the last comment matching the status comment filtering options in the report. |
Text |
Status Comment (Last) Type |
Status Comment (Last) Type |
The last (most recent) Project Status Comment Type assigned to the project in the Project Status View. If status comment filtering is applied in the report, this will be the last comment matching the status comment filtering options in the report. |
Text |
Status Description |
Status Description |
Status Description as entered in the Project Add/Edit form. |
Text |
Schedule End Baseline |
End Date Baseline |
Schedule End Date from the current baseline. |
Date |
Schedule End Date |
End Date |
Schedule End Date based on the end date of the latest task end date in the project. |
Date |
Schedule Start Baseline |
Start Date Baseline |
Schedule Start Date from the current baseline. |
Date |
Status Description |
Status Description |
Status Description entered in the Project Add/Edit form. |
Text |
Target Billable Expense |
Target Billable Expense |
Target Billable Expense entered in the Project Add/Edit form. |
Currency |
Target Billable Hours |
Target Billable Hours |
Target Work Billable Hours entered in the Project Add/Edit form. |
Hours |
Target Billable Rate |
Target Billable Rate |
Target Billable Rate entered in the Project Add/Edit form. |
Currency |
Target Billable Time |
Target Billable Time |
Target Billable Time entered in the Project Add/Edit form. |
Currency |
Target Billable Total |
Target Billable Total |
Target Billable Total entered in the Project Add/Edit form. |
Currency |
Target Expense |
Target Expense |
Target Expense entered in the Project Add/Edit form. |
Currency |
Target Hours |
Target Hours |
Target Hours entered in the Project Add/Edit form. |
Hours |
Target Rate |
Target Work Rate |
Target Rate entered in the Project Add/Edit form. |
Currency |
Target Time |
Target Time |
Target Time entered in the Project Add/Edit form. |
Currency |
Target Total |
Target Total |
Target Total entered in the Project Add/Edit form. |
Currency |
Type |
Type |
Project Type assigned to the project in the Project Add/Edit form. |
Text |
Type Code |
Type Code |
Project Type assigned to the project in the Project Add/Edit form. |
Text |
Var. Est Expense vs Actual |
Var. Est Expense vs Actual |
Est. Expense - Actual Expenses Total |
Currency |
Var. Est Expense vs Actual % |
Var. Est Expense vs Actual % |
Var. Est Expense vs Actual / Estimated Expense Total |
Percent |
Var. Est Hours vs Actual |
Var. Est Hours vs Actual |
Est. Hours - Actual Hours |
Hours |
Var. Est Hours vs Actual % |
Var. Est Hours vs Actual % |
Var. Est Hours vs Actual / Estimated Hours |
Percent |
Var. Est Rate vs Actual |
Var. Est Rate vs Actual |
Est. Rate - Actual Rate |
Currency |
Var. Est Rate vs Actual % |
Var. Est Rate vs Actual % |
Var. Est Rate vs Actual / Estimated Rate |
Percent |
Var. Est Time vs Actual |
Var. Est Time vs Actual |
Est. Time - Actual Time |
Currency |
Var. Est Time vs Actual % |
Var. Est Time vs Actual % |
Var. Est Time vs Actual / Estimated Time Total |
Percent |
Var. Est Total vs Actual |
Var. Est Total vs Actual |
Est. Total - Actual Total |
Currency |
Var. Est Total vs Actual % |
Var. Est Total vs Actual % |
Var. Est Total vs Actual / Estimated Total |
Percent |
Var. Invoiced Expense vs Billable |
Var. Invoiced Expense vs Billable |
Invoiced Expense - Billable Expense |
Currency |
Var. Invoiced Expense vs Billable % |
Var. Invoiced Expense vs Billable % |
Var. Invoiced Expense vs Billable / Invoiced Expense |
Percent |
Var. Invoiced Hours vs Billable |
Var. Invoiced Hours vs Billable |
Invoiced Hours - Billable Hours |
Hours |
Var. Invoiced Hours vs Billable % |
Var. Invoiced Hours vs Billable % |
Var. Invoiced Hours vs Billable / Invoiced Hours |
Percent |
Var. Invoiced Rate vs Billable |
Var. Invoiced Rate vs Billable |
Invoiced Rate - Billable Rate |
Currency |
Var. Invoiced Rate vs Billable % |
Var. Invoiced Rate vs Billable % |
Var. Invoiced Rate vs Billable / Invoiced Rate |
Percent |
Var. Invoiced Time vs Billable |
Var. Invoiced Time vs Billable |
Invoiced Time - Billable Time |
Currency |
Var. Invoiced Time vs Billable % |
Var. Invoiced Time vs Billable % |
Var. Invoiced Time vs Billable / Invoiced Time |
Percent |
Var. Invoiced Total vs Billable |
Var. Invoiced Total vs Billable |
Invoiced Total - Billable Total |
Currency |
Var. Invoiced Total vs Billable % |
Var. Invoiced Total vs Billable % |
Var. Invoiced Total vs Billable / Invoiced Total |
Percent |
Var. Prop. Expense vs Billable |
Var. Prop. Expense vs Billable |
Prop. Expense - Billable Expense |
Currency |
Var. Prop. Expense vs Billable % |
Var. Prop. Expense vs Billable % |
Var. Prop. Expense vs Billable / Proposed Expense Total |
Percent |
Var. Prop. Hours vs Billable |
Var. Prop. Hours vs Billable |
Prop. Hours - Billable Hours |
Hours |
Var. Prop. Hours vs Billable % |
Var. Prop. Hours vs Billable % |
Var. Prop. Hours vs Billable / Prop. Hours |
Percent |
Var. Prop. Rate vs Billable |
Var. Prop. Rate vs Billable |
Prop. Rate - Billable Rate |
Currency |
Var. Prop. Rate vs Billable % |
Var. Prop. Rate vs Billable % |
Var. Prop. Rate vs Billable / Prop. Rate |
Percent |
Var. Prop. Time vs Billable |
Var. Prop. Time vs Billable |
Prop. Time - Billable Time |
Currency |
Var. Prop. Time vs Billable % |
Var. Prop. Time vs Billable % |
Var. Prop. Time vs Billable / Prop. Time |
Percent |
Var. Prop. Total vs Billable |
Var. Prop. Total vs Billable |
Prop. Total - Billable Total |
Currency |
Var. Prop. Total vs Billable % |
Var. Prop. Total vs Billable % |
Var. Prop. Total vs Billable / Prop. Total |
Percent |
Var. Work Billable Expense vs Billable |
Var. Work Billable Expense vs Billable |
Work Billable Expense - Billable Expense |
Currency |
Var. Work Billable Expense vs Billable % |
Var. Work Billable Expense vs Billable % |
Var. Work Billable Expense vs Billable / Work Billable Expense |
Percent |
Var. Work Billable Rate vs Billable |
Var. Work Billable Rate vs Billable |
Work Billable Rate - Billable Rate |
Currency |
Var. Work Billable Rate vs Billable % |
Var. Work Billable Rate vs Billable % |
Var. Work Billable Rate vs Billable / Work Billable Rate |
Percent |
Var. Work Billable Time vs Billable |
Var. Work Billable Time vs Billable |
Work Billable Time - Billable Time |
Currency |
Var. Work Billable Time vs Billable % |
Var. Work Billable Time vs Billable % |
Var. Billable Time vs Billable / Work Total Time Billable |
Percent |
Var. Work Billable Total vs Billable |
Var. Work Billable Total vs Billable |
Work Billable Total - Billable Total |
Currency |
Var. Work Billable Total vs Billable % |
Var. Work Billable Total vs Billable % |
Var. Work Billable Total vs Billable / Work Billable Total |
Percent |
Var. Work Expense vs Actual |
Var. Work Expense vs Actual |
Work Expense vs Actual - Actual Expense |
Currency |
Var. Work Expense vs Actual % |
Var. Work Expense vs Actual % |
Var. Work Expense vs Actual / Work Expense |
Percent |
Var. Work Hours vs Actual |
Var. Work Hours vs Actual |
Work Hours - Actual Hours |
Hours |
Var. Work Hours vs Actual % |
Var. Work Hours vs Actual % |
Var. Work Hours vs Actual / Work Hours |
Percent |
Var. Work Hours Billable vs Billable |
Var. Work Hours Billable vs Billable |
Work Hours - Billable Hours |
Hours |
Var. Work Hours Billable vs Billable % |
Var. Work Hours Billable vs Billable % |
Var. Work Hours Billable vs Billable / Work Hours |
Percent |
Var. Work Rate vs Actual |
Var. Work Rate vs Actual |
Work Rate - Actual Rate |
Currency |
Var. Work Rate vs Actual % |
Var. Work Rate vs Actual % |
Var. Work Rate vs Actual / Work Rate |
Percent |
Var. Work Total Time vs Actual |
Var. Work Total Time vs Actual |
Work Total Time - Actual Time |
Currency |
Var. Work Total Time vs Actual % |
Var. Work Total Time vs Actual % |
Var. Work Total Time vs Actual / Work Total Time |
Percent |
Var. Work Total vs Actual |
Var. Work Total vs Actual |
Work Total - Actual Total |
Currency |
Var. Work Total vs Actual % |
Var. Work Total vs Actual % |
Var. Work Total vs Actual / Work Total |
Percent |
Work Billable Earned Value |
Work Billable Earned Value |
Total Work Billable Earned Value for all tasks in the project(s). Uses the work percent complete multiplied by hours and billable rates. |
Currency |
Work Billable Estimate At Completion |
Work Billable Estimate At Completion |
Total Work Billable Estimate At Completion for all tasks in the project(s). Actual Total + Work Billable Estimate To Complete. |
Currency |
Work Billable Estimate At Completion (CPI) |
Work Billable Estimate At Completion (CPI) |
Work Billable Estimate At Completion divided by the Cost Performance Index. Assumes that the remaining billable work will be performed at the same level of efficiency (performance) as the completed billable work. |
Currency |
Work Billable Estimate At Completion (CPI) - Aggregated Weight |
Work Billable Estimate At Completion (CPI) - Aggregated Weight |
|
Currency |
Work Billable Estimate To Complete |
Work Billable Estimate To Complete |
Work Billable Total - Work Billable Earned Value |
Currency |
Work Billable Expense |
Work Billable Expense |
Work Billable Expense total for all project tasks. |
Currency |
Work Billable Planned Hours |
Work Billable Planned Hours |
Total of all Work Billable Planned Hours for completion on all project(s) tasks through the previous working day. |
Hours |
Work Billable Planned Value |
Work Billable Planned Value |
Total of all Work Billable Planned Value for completion on all project(s) tasks through the previous working day. |
Currency |
Work Billable Rate |
Work Billable Rate |
Work Billable Time / Work Hours |
Currency |
Work Billable Total |
Work Billable Total |
Total Work Billable Time and Expenses for all tasks in the project(s). Work Billable Time + Work Billable Expense |
Currency |
Work Billable Time |
Work Billable Time |
Total Work Billable Time for all tasks in the project(s). The sum of the work hours multiplied by the billable rates for the resources assigned to the work. |
Currency |
Work Earned Value |
Work Earned Value |
Total of all Work Earned Value completed on all project(s) tasks. Based on the Work Hours and Work Rate multiplied by the Work Percent Complete on the project tasks. |
Currency |
Work Estimate At Completion |
Work Estimate At Completion |
Total Work Estimate At Completion for all project tasks. Work Estimate To Complete + Work Total |
Currency |
Work Estimate At Completion (CPI) |
Work Estimate At Completion (CPI) |
Total Work Estimate At Completion for all project tasks. Work Estimate To Complete + Work Total / Cost Performance Index |
Currency |
Work Estimate At Completion (CPI) - Aggregated Weight |
Work Estimate At Completion (CPI) - Aggregated Weight |
Total Work Estimate At Completion for all project tasks. Work Estimate To Complete + Work Total / Cost Performance Index |
Currency |
Work Estimate To Complete |
Work Estimate To Complete |
Work Total - Work Earned Value. |
Currency |
Work Expense |
Work Expense |
Total of all Work Expense for all tasks in the project(s). |
Currency |
Work Hours |
Work Hours |
Total Work Hours for all tasks in the project(s). |
Hours |
Work Hours Completed |
Work Hours Completed |
Total Work Hours Completed for all tasks in the project(s). |
Hours |
Work Hours Estimate At Completion |
Work Hours Estimate At Completion |
Total Work Hours Estimate At Completion for all project tasks. Work Hours Estimate To Complete + Actual Hours |
Hours |
Work Hours Estimate At Completion (CPI) |
Work Hours Estimate At Completion (CPI) |
Total Work Hours Estimate At Completion for all project tasks. Work Hours Estimate To Complete + Actual Hours / Cost Performance Index |
Hours |
Work Hours Estimate To Complete |
Work Hours Estimate To Complete |
Work Hours - Work Hours Completed |
Hours |
Work Hours Estimate To Complete (CPI) - Aggregated Weight |
Work Hours Estimate To Complete (CPI) - Aggregated Weight |
|
Hours |
Work Planned Hours |
Work Planned Hours |
Total of all Work Planned Hours for completion on all project(s) tasks through the previous working day. |
Hours |
Work Planned Value |
Work Planned Value |
Total of all Work Planned Value for completion on all project(s) tasks through the previous working day. |
Currency |
Work Rate |
Work Rate |
Work Total Time / Work Hours |
Currency |
Work Time |
Work Time |
Total of all Work Time for all tasks in the project(s). Based on the Work Hours and the hourly rates of the resources assigned to the work. |
Currency |
Work Total |
Work Total |
Total of all Work Total for all tasks in the project(s). Work Time Total + Work Expense |
Currency |