Increase the Task Duration when I change an End Date
If I change an end date in the task list on a task with the constraint As Soon As Possible, the task changes to a Must Finish On constraint and maintains the same duration. I don't want to change the constraint, I need it to stay As Soon As Possible and increase the duration.
Alternatively, if I change the end date with a drag and drop on the end of the task line on the Gantt chart it does what I want. The end date changes by increasing the duration. I'd like the task list edit to do the same.